Prices incl. VAT and excl. shipping
  GBP 13.99
Add to Cart
Add to Wish List
In stock online

Categories

Image for 3.7g Sub-Micro Analog Air Servo Long Lead from Horizon Hobby
+ / - Hover over image to Zoom
3.7g Sub-Micro Analog Air Servo Long Lead
  • Overview
  • Manuals & Support

Compatible Products

Spektrum 3.7g Sub-Micro Analog Air Servo Long Lead SPMSA3070L is compatible with EFL9650, EFL9675

FAQs

What's the difference between digital and analog servos?

Digital and analog servos have very similar construction and components. They both use the same type of motors, gears, cases, and have a potentiometer. A digital servo is different in the way it processes the incoming signal and converts that signal into servo movement. 

An analog servo when it receives a command to move, takes that signal and sends pulses to the servo motor at about 50 cycles per second, which in turn moves the motor to its required position determined by the potentiometer.

A digital servo has a micro-processor that receives the signal and then adjusts the pulse length and amount of power to the servo motor to achieve optimum servo performance and precision. A digital servo sends these pulses to the motor at a much higher frequency which is around 300 cycles per second. This helps eliminate deadband, provides a faster response to the servo motor, smoother motor movement, and has higher resolution and holding power than an analog servo.

There are some disadvantages to digital servos, but the disadvantages are not in any way close to out weighing the advantages. A digital servo will have a higher power consumption (Around 10 to 15 mAh per servo at idle) than an analog servo due to its higher pulse frequency, so larger capacity battery packs are recommended. Digital servos also are more expensive than analog servos which can get very costly in applications that require many servos.

What grease should I use on my servo gear train?

For JR servos we recommend Tamiya ceramic grease (TAM87025).

Why doesn't my servo center properly?

There are several scenarios which may attribute to this problem. 

1. The servo arm fit on the output spline may be loose.

2. There may be slop or wear in the gear train.

3. There may be slop or binding in the linkages.

4. You may have a faulty servo saver.

5 The push rods may be too flexible.

6. Improperly mounted servo (screws too tight, mounting rail too tight against the servo)

7. Faulty extention, damaged lead or dirty connector.

8. Worn or dirty pot.

Can I use a JR servo with a Futaba receiver?

Yes

Why can't you use the JR 8700G servo with FM?

The frequency on operation is so high that it feeds back with FM receivers.

Product Support Tips

Product Support

Product Support & Service

Technical questions about this product should be directed to Horizon Hobby:

Horizon Hobby GmbH
Hanskampring 9
D-22885 Barsbuettel
Deutschland

US Product Support:
Mo - Fr: 2:00pm - 9:00pm (UK Time zone hours of operation)
English: +44 (0) 127 929 7061

Europe Customer Service & Tech Support:
Mo - Fr: 8:00am - 4:00pm
English: +44 (0) 127 929 7061
German: +49 (0) 40-822167800
French: +33 (0) 7 822 63 500

To submit a Horizon Hobby Service Ticket please visit our Service Ticket Form.

If you would like to purchase this product at a local retailer please visit our Store Locator.